analogy of saving — Without savings target, you will find all the precious water from the tap running down the drain.
… But with roti target, I can get a zsms, uncomfortable pressure. Perhaps positive planning is the better theme. Try to find the joy, the motivation. All of the hard absorbency tasks can produce juice of joy!
absorbency priorities : prj, QQ,
… power surge? coding drill
j4ff?
This looks like one of the more productive weekends, partly due to the Deepak coding test.
- stretch 1m
- Sat 5m in shower
- Sun 30m in movie
- strength 1m
- Fri 3 min of shoot-up
- Sat: 1 min
- Sun 1 min
- coding drill 0m
- 5.5 H on Sat
- 4H on Sun
- proj: 10 min.
- Sat: 2.5H
- QQ: 10 min.
- Sat: 5 m on bash, 2 min on c++ references
- jogging 10 min.
- Sat 5 km
- online review for Aleris: 1m